Junction function
GS MW U wall junction = identical construction to S/CH (page 21). The difference = concealed panel fixing, with fasteners invisible on the façade.
Critical installation aspects
- Mineral wool in the gap — class A1 for fire-resistant walls.
- Wall waterproofing continued behind OB-19.
- Thermal movement — flexible wool infill.
For full guidelines — see S/CH vertical wall junction.
Documentation
Technical Catalogue GS MW S/CH/U (Gór-Stal 2025), page 50 — Wall junction, vertical GS MW U layout. Scale 1:5.
Components in this junction
Panel (1)
- 01
Insulation (1)
- 06 Mineral wool
Flashing (2)
- 03 OB-19 cover flashing (OB-19)
- 04 OB-07 internal corner flashing (OB-07)
Fastener (2)
- 07 Self-drilling fastener for sandwich panels
- 08 Self-drilling fastener for sheet metal or 4.0×8.0 rivet
Sealant (1)
- 05 PES sealing tape
Element (1)
- 02 Wall and framing per structural design