Junction function
Edge support U = analogous to MiWo U (p. 66).
Critical installation aspects
- 20 mm gap between panel and column.
- PM1 + fastener in the joint.
Documentation
Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 70 — Edge support, horizontal U layout. Scale 1:5.
Components in this junction
Panel (1)
- 01 GS insPIRe® U wall panel (insPIRe U)
Flashing (1)
- 03 OB-17 cover flashing (OB-17)
Accessory (1)
- 07 PM1 mounting plate (PM1)
Fastener (2)
- 06
- 08
Sealant (2)
- 04
- 05 Impregnated PURS gasket or expanding foam
Element (1)
- 02 Steel column per structural design