Detail · insPIRe® CH

Fixing of insPIRe® CH panels — positive temperature (t > 0°C)

Horizontal + cross-section (A-A) of cold storage panel fixing in rooms with temperatures above 0°C (fruit, vegetable, dairy cold rooms). Stainless steel self-drilling fasteners + installation foam + plastic sealant.

Fixing of insPIRe® CH panels — positive temperature (t > 0°C)

Junction function

Cold storage fixing t > 0°C = standard scheme for a working cold room (typically +2…+10°C). Compared to typical industrial walls (insPIRe S):

  • AISI 304/316 stainless steel fasteners — in cold rooms water condensation is constant; galvanised coating corrodes within 5–10 years.
  • Double sealing — PES tape + plastic sealant on both sides.
  • PUR foam in panel joints (cold room + corridor have different temperatures → continuous structural work).

Critical installation aspects

  • Stainless steel fastener only — standard galvanised steel MUST NOT be used in cold rooms; condensation → corrosion → leak after 5 years.
  • Layout of 3 fasteners per 1000 mm width — as in typical S.
  • PUR foam (item 04) in panel joints + plastic sealant on both sides.
  • Plastic sealant on both sides (items 05, 06) — vapour barrier on the cold room side + moisture protection on the corridor side.
  • Pressure test of the wall before handover — detects leaks in panel joints.

Documentation

GS insPIRe® CH Cold Storage Catalogue (Gór-Stal 2025), page 12 — Fixing of cold storage panels t > 0°C. Scale 1:5.

Components in this junction

Panel (1)
Fastener (1)
  • 03
    Stainless steel self-drilling fastener
Sealant (4)
  • 04
    Polyurethane installation foam
  • 05
    Permanently plastic sealing compound
  • 06
    Permanently plastic sealing compound
  • 07
    PES sealing tape
Element (1)
  • 02
    Supporting structure