Eaves · insPIRe®

Roof edge flush with wall outline — variant II (GS PIR D)

Variant II of the flush edge with an **additional raised fastener** for reinforcement. Used in halls exposed to stronger wind pressure (zones III/IV).

Roof edge flush with wall outline — variant II (GS PIR D)

Junction function

Variant II of the flush edge = with an additional raised fastener. For aggressive wind conditions (zones III/IV per PN-EN 1991-1-4).

Critical installation aspects

  • Additional raised fastener = better anchoring of the building outline.
  • Other rules = as in variant I (page 97).

Documentation

Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 96 — Flush edge, variant II. Scale 1:5.

Components in this junction

Panel (2)
Flashing (2)
Accessory (1)
Fastener (3)
  • 08
    Self-drilling fastener for sandwich panels
  • 10
    Self-drilling fastener for metal sheets (hex head)
  • 11
    Self-drilling fastener for metal sheets (washer head)
Sealant (2)
  • 06
    PES sealing tape
  • 07
    Polyurethane assembly foam
Element (1)
  • 02
    Building structure per design