Junction function
Vertical U gate post = analogous to S (p. 22). OB-21 reinforced for forklift traffic.
Critical installation aspects
- Reinforced OB-21 + bumper guard.
- Insulation in the cavity.
- EPDM between gate and OB-21.
Documentation
Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 56 — Gate post, vertical U layout. Scale 1:5.
Components in this junction
Panel (1)
- 01 GS insPIRe® U wall panel (insPIRe U)
Insulation (1)
- 05 Thermal insulation installed on site
Flashing (1)
- 04 OB-21 gate flashing (OB-21)
Fastener (2)
- 07 Self-drilling fastener for sandwich panels
- 08 Self-drilling fastener for sheet metal or 4.0×8.0 rivet
Sealant (1)
- 06 PES sealing tape
Element (2)
- 02 Steel column and rail framing per structural design
- 03 Industrial gate