Junction function
T-junction partition + exterior wall = separating cold-storage chambers within a larger hall. Typical arrangements:
- Cold-storage chamber + freezer chamber + working corridor — 3 temperature zones inside one hall.
- Sorting room + cold room — separate rooms with different temperatures.
Construction:
- Continuous exterior wall (item 01) without interruption.
- Partition wall abuts the exterior wall; facing in the joint zone is removed.
- PVC corner profile provides thermal insulation.
- PUR foam + plastic sealant seals the perimeter.
Critical installation aspects
- Facing removal within 0.5×D of the corner.
- PVC profile prevents thermal bridging at the T-junction.
- Stainless fastener with EPDM gasket.
- Plastic sealing compound on both sides.
Documentation
GS insPIRe® CH Cold-Storage Catalogue (Gór-Stal 2025), page 13 — Partition wall to exterior wall connection. Scale 1:5.
Components in this junction
Panel (1)
- 01 GS insPIRe® CH / CH MAX cold-room panel (insPIRe CH)
Flashing (1)
- 02 PVC corner profile
Fastener (1)
- 05 Stainless self-drilling fastener with gasket
Sealant (2)
- 03 Polyurethane assembly foam
- 04 Permanently plastic sealing compound