Junction function
Freezer partition wall at floor, variant I = complete sub-floor build-up with a PVC concrete plinth profile. Variant I differs from variant II (p. 35) in the way the bottom of the panel is finished.
Critical installation aspects
- Concrete plinth with PVC profile (item 08) — protects the lower edge of the panel.
- termPIR beneath the floor — 150-200 mm thick.
- Vapour barrier under the termPIR.
- Concrete floor with plinth — continued along the partition wall.
Documentation
Cold-store Catalogue GS insPIRe® CH (Gór-Stal 2025), page 32 — Freezer partition wall at floor, variant I. Scale 1:5.
Components in this junction
Panel (1)
- 01 GS insPIRe® CH / CH MAX cold-store panel (insPIRe CH)
Insulation (1)
- 02 termPIR® insulation board (termPIR)
Flashing (1)
- 08 PVC concrete plinth profile
Sealant (2)
- 07 Polyurethane assembly foam
- 09 Permanently plastic sealing compound
Element (4)
- 03 Concrete floor slab
- 04 Cement levelling layer
- 05 Vapour barrier — bituminous felt or PE film
- 06 Concrete floor with plinth