Junction function
Roof termination at fire wall = upper junction of the roof with the wall (on the raised-pitch side — top of the roof penetrates into the wall). Requires OB-30 roof flashing — extending 30 cm above the roofing + drip edge.
Critical installation aspects
- OB-30 extends 30 cm above the roofing (Technical Conditions § 235) for fire requirements.
- Mechanical anchors to the wall (item 12).
- Butyl compound + assembly foam seal the gaps.
Documentation
Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 101 — RC wall, roof termination. Scale 1:5.
Components in this junction
Panel (1)
- 01 GS PIR D roof panel (GS PIR D)
Flashing (3)
- 04 OB-30 roof flashing (OB-30)
- 05 OB-12 drip edge (OB-12)
- 06 OB-07 internal corner flashing (OB-07)
Fastener (4)
- 10 Self-drilling fastener for sandwich panels
- 11 Self-drilling fastener for sheet metal (hex head)
- 12 Steel quick-fit expansion anchor
- 13 Self-drilling fastener for sheet metal (washer head)
Sealant (3)
- 07 PES sealing tape
- 08 Polyurethane assembly foam
- 09 Butyl sealing compound
Element (2)
- 02 Purlin per structural design
- 03 Reinforced concrete or masonry fire wall