Wall junction · insPIRe®

RC wall — roof start (GS PIR D)

Roof start detail at a reinforced concrete fire wall (e.g. inter-segment wall in twin halls). Custom masking flashing + OB-12 drip edge + OB-07 corner + thermal insulation infill.

RC wall — roof start (GS PIR D)

Junction function

Roof start at a fire wall = the lower joint between the roof and the wall (most often an inter-segment wall in twin halls). Critical for:

  • Fire safety REI 60-120 per PN-EN 13501-2.
  • Watertightness — water runs down the fire wall and must be drained off.

Critical installation aspects

  • OB-12 drip edge drains water from the roof away from the wall.
  • OB-07 on the inside provides masking from the interior.
  • Butyl sealant (item 09) seals the gaps — critical.
  • Thermal insulation infill (item 08) = mineral wool class A1 for the fire wall.
  • Mechanical fastener to the wall (item 12) selected according to the material (RC vs brick).

Documentation

Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 100 — Reinforced concrete wall, roof start. Scale 1:5.

Components in this junction

Panel (1)
Insulation (1)
  • 08
    Thermal insulation infill
Flashing (3)
Fastener (4)
  • 10
    Self-drilling fastener for sandwich panels
  • 11
    Self-drilling fastener for sheet metal (hex head)
  • 12
    Mechanical fastener matched to wall material
  • 13
    Self-drilling fastener for sheet metal (washer head)
Sealant (2)
  • 07
    PES sealing tape
  • 09
    Butyl sealant
Element (2)
  • 02
    Purlin per structural design
  • 03
    Reinforced concrete or masonry fire wall