Base · insPIRe®

Floor base mounting — vertical insPIRe® S panel layout

Bottom fixing of vertical PIR panels directly to the concrete floor slab. OB-42 starter channel guides the bottom row, OB-05 trim finishes the interior side. Quick-install expansion anchors.

Floor base mounting — vertical insPIRe® S panel layout

Junction function

Floor mounting = alternative to a base course with a sill beam. Used for interior halls or floor slabs raised >15 cm above ground level.

Critical installation aspects

  • OB-42 channel raised 30 mm above the floor (waterproofing).
  • Expansion anchors at 60 cm centres in the field zone, 40 cm at the edge zone.
  • No OB-13 drip flashing — only for interior halls inside a larger enclosure.
  • PIR vs MW — no mineral wool inside the channel (PIR is rigid and self-supporting).

Documentation

Technical Catalogue insPIRe S/U + GS PIR D (Gór-Stal 2025), page 14 — Floor mounting, vertical S layout. Scale 1:5.

Components in this junction

Panel (1)
Flashing (2)
Fastener (3)
  • 05
    Self-drilling fastener for sandwich panels
  • 06
    Self-drilling fastener for sheet metal or 4.0×8.0 rivet
  • 07
    Steel quick-install expansion anchor
Sealant (1)
  • 04
    Impregnated PURS gasket or expanding foam